Tying to a mooring buoy means approaching slowly into the wind or current, picking up the pendant with a boat hook and running a line through the ring to a bow cleat. First make sure it is a mooring buoy and you have the right to use it. Tying to a navigation buoy is illegal in Arizona.
Know your buoy
Arizona's handbook says mooring buoys are white with a blue horizontal band and are found in marinas and other areas where vessels may anchor. Willfully tying up to a navigation buoy not intended for mooring is illegal, and it is unlawful to moor to a buoy (other than a mooring buoy), beacon, light or other navigational aid (Arizona Game and Fish boater handbook). Many mooring buoys are private or run by a marina, so you need permission. Ask the marina or owner first.
The Havasu National Wildlife Refuge says boat mooring is not permitted there (US Fish and Wildlife Service).
Before you approach
- Assign jobs. One person drives, one person is on the bow with a boat hook and a line, and everyone else sits.
- Rig a line with a loop or a long dock line ready on the bow cleat, with the other end free to pass through the ring.
- Check wind and current. Look at how other moored boats are lying, because they point into the stronger of the two.
- Fenders out, and engine in good order.
Picking it up, step by step
- Approach slowly from downwind or down-current, pointing the bow into whichever is stronger. This lets you stop the boat by slowing down, not by fighting it.
- Aim to stop with the buoy alongside the bow, within reach of the bow person. Use short bursts of neutral and reverse to take off way.
- Hook the pendant (the loop of line on the buoy) with the boat hook, or grab the ring.
- Run your line through the ring or pendant and back to a bow cleat on the same side. If a pendant has a loop, you can pass your line through it. Use two lines if the pendant is small or the conditions are strong.
- Cleat both ends with a cleat hitch and adjust the length so the boat lies directly in front of the buoy.
- Shut off the engine once you are secure, and check that the boat is not touching the buoy or other boats.
Leaving the buoy
- Start the engine and check around for traffic.
- Take the line off the cleat and let it run through the ring, so you do not have to go to the buoy to release it.
- Back away slowly with the line clear of the prop.
Common mistakes
- Approaching too fast and overshooting.
- Approaching across the wind so the boat blows past.
- Leaning out over the bow with a boat hook. Keep your weight inside the boat.
- Letting the line fall in the water near the prop.
- Tying to a navigation or channel marker. Do not do that, ever.
- Leaving the boat tied for days with no check. Arizona law also limits mooring or fastening on public waters to 14 consecutive days unless you move 25 nautical miles or more or are authorized.
The boat matters
A boat with a good bow cleat, a bow roller and a decent boat hook position is easier to tie up. See used boats, and ask for an on-water demo once you are ready to buy. We arrange on-water demos.
Related guides: How to use dock lines · How to dock at a marina · How to set an anchor
Common questions
What does a mooring buoy look like?
Arizona's handbook describes it as white with a blue horizontal band.
Can I tie to any buoy?
No. It is illegal to tie to a navigation buoy or other navigational aid. Only use a mooring buoy that you are allowed to use.
Which way do I approach a buoy?
Into the wind or current, whichever is stronger, so you can stop with the buoy next to the bow.
Do I need permission?
Often yes. Many mooring buoys are private or run by a marina, so ask first.
How do I tie to a buoy?
Pass a line through the buoy ring or pendant and cleat both ends on the bow.
Next step
See what is on the lot in our used boat inventory, or call (928) 453-8833, text (928) 732-2281 or stop by 1680 Industrial Blvd in Lake Havasu City (Monday to Saturday 8 to 5, Sunday 9 to 2). Have a boat, pontoon, jet ski or trailer to sell? We consign it with no fees: we agree on a fair market value with you, and you get a check within 10 business days after the deal is funded.
